- Peak demand: the highest one-hour average power use in a period (MW).
- SPP: Southwest Power Pool, the regional grid operator including Kansas.
- EIA-930: the federal hourly grid-operations survey.
- Subregion WR / KCPL: EIA-930 areas within SPP roughly matching Evergy Kansas Central and Evergy Metro service areas.
- Net internal demand: forecast peak minus demand response that can be called on.
- Planning reserve margin (PRM): extra capacity required above the forecast peak (16% summer, 36% winter in SPP for 2026).
- Load factor: average demand divided by peak; lower means a peakier system.