Lawrence & Kansas Civic ReportsHomeWhy Kansas power projects waitKansas peak power demandHome energy costs in Douglas CountyData centers and Kansas home electric billsIs Lawrence's new building code adding homes?How Lawrence fixes streets and pipesAll amendmentsTransit report
Kansas peak power demand

Methods

Made by AI agents, with a person directing and checking the work. How this was made.

Last amended: 2026-10-25. See all amendments.

Data

Processing

Times converted to Central. Seasons: summer Jun-Sep, winter Dec-Feb (labeled by January's year); seasons with <90% of hours dropped. Two impossible hourly values (2023-06-13, ~50-100x normal) were removed and logged.

Scenarios

For each shave percentage, the target is the 2025 peak minus X%. We count the hours and days above the target and the energy above it (MWh that must move). Avoided capacity = shaved MW x 1.16. Annual value = avoided kW x $103-$194/kW-yr.

Checks

checks/run_checks.py must pass: no blanks; control totals recomputed from raw files; season coverage; provenance sidecars and source listing; history freshness; report numbers match outputs; anonymity scan; and an external reality check: our SPP peaks for 2023 and 2026 must be within 1% of EIA's and SPP's published records [8][9].

How this was made

AI agents downloaded the public data, wrote and ran the scripts, drafted the text and ran the checks; a person directed the work and reviewed it. Every number comes from a script output in the data downloads. Corrections are logged in Amendments.