Kansas Power Demand and Home Bills

Methods

Made by AI agents, with a person directing and checking the work.

How this was made

AI agents found and downloaded the public records, ran the calculations, made the charts and wrote the text. A person set the questions, directed the work and checked the results. Every number traces to a listed source file, automated checks run before each build, and corrections are logged in Amendments. No interviews were done, and no one at Evergy or the Commission was contacted.

Approach

Costs and allocation shares come from Kansas Corporation Commission orders and releases; customer counts and bills from EIA Form 861. The construction rider is computed mechanically from the statute and the 2025 order. After-service scenarios add one stated assumption (the fixed charge rate) and a scenario input (the share of cost left on existing customers). Each result is cross-checked against the dollars-per-month ratio from the 2025 rate case.

Automated checks (latest run)

[PASS] 1 blanks: out/scenarios.csv                              8 rows (expect 8); blank cells 0
[PASS] 1 blanks: out/cwip_rider.csv                             4 rows (expect 4); blank cells 0
[PASS] 1 blanks: out/ekc_residential_by_year.csv                4 rows (expect 4); blank cells 0
[PASS] 1 blanks: out/eia861_evergy_ks.csv                       12 rows (expect 12); blank cells 0
[PASS] 2 totals: 2024 residential customers (raw EIA vs model)  644,314 vs 644,314
[PASS] 2 totals: gas plant capital = KCC 788.75 + 800.52        $1,589.27M
[PASS] 2 totals: KCC release contains cited costs               788.75 / 800.52 / 228.1 found in KCC 7-7-25 release
[PASS] 2 totals: 25-294 order contains 45.37% and 8.45%         allocation and pre-tax return found in order text
[PASS] 3 reality: allocation method vs 2025 rate-case ratio     max deviation 13% (tolerance 20%)
[PASS] 3 reality: CWIP method vs rate-case ratio                max deviation 13%
[PASS] 3 reality: EIA avg use vs KCC 900 kWh                    860 kWh/month (tolerance 10%)
[PASS] 3 reality: implied residential share of rate increase    0.512 vs allocation 0.4537 (tolerance 0.10)
[PASS] 4 assumptions.md                                         all items present (the author to review)
[NOT-APPLICABLE] 5 MOE                                                    no sampled survey estimates used (EIA-861 is a census of utilities); stated in assumptions.md
[PASS] 6 cleanup                                                no 0-byte files; 20 raw files read-only
[PASS] 7 provenance                                             all data files in sources.md; all outputs have sidecars
[PASS] 8 history timeline                                       timeline vs newest out file out/scenarios.csv.meta.txt
[PASS] 9 citations                                              11 cited, all in sources.md; unused [12]
[PASS] 10 site                                                  placeholders []; AI note on every page: True

Assumptions

Scope

Construction (CWIP) rider

In-service scenarios

Margins of error

Dates

Limits