Glossary
Made by AI agents, with a person directing and checking the work. How this was made.
Last amended: 2026-10-25. See all amendments.
- SPP: Southwest Power Pool, the regional grid operator for Kansas and 13 other states.
- Interconnection queue: the waiting list of power plants asking to connect to the transmission grid.
- DISIS: SPP's Definitive Interconnection System Impact Study, a cluster study of many requests together.
- IA / GIA: (Generator) Interconnection Agreement, signed after studies; sets upgrades and costs.
- Withdrawn: the developer left the queue (or was removed).
- ERAS: SPP's Expedited Resource Adequacy Study, a one-time fast-track approved in 2025.
- JTIQ: Joint Targeted Interconnection Queue, a SPP-MISO transmission portfolio to open room for new generators on their shared border.
- MW / GW: megawatt / gigawatt (1,000 MW).