Sources
Every dataset and document used. Copies are kept read-only in the project files; numbers in brackets are cited in the report.
| # | Dataset or document | Source | Vintage | Retrieved |
|---|---|---|---|---|
| [1] | SPP Generation Interconnection active request list (data/GenerateActiveCSV.csv) | https://opsportal.spp.org/Studies/GenerateActiveCSV | Last updated 10/22/2026 | 2026-10-25 |
| [2] | LBNL "Queued Up" interconnection queue data file through 2025 (data/lbnl_ix_queue_data_file_thru2025.xlsx) | https://eta-publications.lbl.gov/publications/us-interconnection-queue-data-0 | May 2026, data through end of 2025 | 2026-10-25 |
| [3] | SPP-MISO Joint Targeted Interconnection Queue (JTIQ) page | https://spp.org/engineering/spp-miso-jtiq/ | Accessed 2026-10-25 | 2026-10-25 |
| [4] | MISO JTIQ Informational Guide (data/miso_jtiq_informational_guide.pdf) | https://cdn.misoenergy.org/JTIQ%20Informational%20Guide728612.pdf | 2025 | 2026-10-25 |
| [5] | SPP ERAS Affected System Study report listing ERAS study-cycle requests | https://opsportal.spp.org/documents/studies/files/2025_Generation_Studies/20260911%20AECI%20SPP%20ERAS%20AFS%20v0%20Report.pdf | 2026-09-11 | 2026-10-25 |
| [6] | FERC Order No. 2023 (interconnection reforms) explainer | https://www.ferc.gov/explainer-interconnection-final-rule | 2023 | 2026-10-25 |
| [7] | Utility Dive, "FERC approves MISO, SPP fast-track interconnection reviews" (news context for ERAS approval, July 21, 2025) | https://www.utilitydive.com/news/ferc-approves-miso-spp-fast-track-interconnection-reviews/753765/ | 2025-07-22 | 2026-10-25 |
| [8] | U.S. Census Bureau cartographic boundary file, counties 1:20m (data/cb_2023_us_county_20m.zip) | https://www2.census.gov/geo/tiger/GENZ2023/shp/cb_2023_us_county_20m.zip | 2023 | 2026-10-25 |
| [9] | Project analysis outputs (scripts/, out/) | /methods.html | Built 2026-10-25 | 2026-10-25 |