Kansas grid connection queue

Sources

Every dataset and document used. Copies are kept read-only in the project files; numbers in brackets are cited in the report.

#Dataset or documentSourceVintageRetrieved
[1]SPP Generation Interconnection active request list (data/GenerateActiveCSV.csv)https://opsportal.spp.org/Studies/GenerateActiveCSVLast updated 10/22/20262026-10-25
[2]LBNL "Queued Up" interconnection queue data file through 2025 (data/lbnl_ix_queue_data_file_thru2025.xlsx)https://eta-publications.lbl.gov/publications/us-interconnection-queue-data-0May 2026, data through end of 20252026-10-25
[3]SPP-MISO Joint Targeted Interconnection Queue (JTIQ) pagehttps://spp.org/engineering/spp-miso-jtiq/Accessed 2026-10-252026-10-25
[4]MISO JTIQ Informational Guide (data/miso_jtiq_informational_guide.pdf)https://cdn.misoenergy.org/JTIQ%20Informational%20Guide728612.pdf20252026-10-25
[5]SPP ERAS Affected System Study report listing ERAS study-cycle requestshttps://opsportal.spp.org/documents/studies/files/2025_Generation_Studies/20260911%20AECI%20SPP%20ERAS%20AFS%20v0%20Report.pdf2026-09-112026-10-25
[6]FERC Order No. 2023 (interconnection reforms) explainerhttps://www.ferc.gov/explainer-interconnection-final-rule20232026-10-25
[7]Utility Dive, "FERC approves MISO, SPP fast-track interconnection reviews" (news context for ERAS approval, July 21, 2025)https://www.utilitydive.com/news/ferc-approves-miso-spp-fast-track-interconnection-reviews/753765/2025-07-222026-10-25
[8]U.S. Census Bureau cartographic boundary file, counties 1:20m (data/cb_2023_us_county_20m.zip)https://www2.census.gov/geo/tiger/GENZ2023/shp/cb_2023_us_county_20m.zip20232026-10-25
[9]Project analysis outputs (scripts/, out/)/methods.htmlBuilt 2026-10-252026-10-25